Mr. Hames has over 31 years experience as a manager, civil engineer and geologist.
He was in charge:
Biginning from April 2008 under EGIS-Route Inc in Algeria,I work as Quality Expert on 356km long of Algerian Highway West section.
From January to March I studied 76km of Railway project in Algeria from Algiers to Tizi-Ouzou.
September 2003 to February 2007 ALGERIA (The Louis Berger Group, Inc USA) Control of work on 26km of Highway construction. ANA Project EL AFFROUN-HOCEINIA section
-Position : Deputy Project Manager- Geotechnician Expert
July 2002 to July 2003 : BURKINA FASO (Louis Berger International Engineering) :Control of work on 260 km of road erection - PASEC TRANSPORT- LOT No3
- Position : Deputy Project Manager- QA/QC Engineer / Geotechnician
August 2000 to November 2001: CHAD (EXXON-MOBIL Huston/ FLUOR DANIEL LTD / LOUIS BERGER Engineering S.A. Paris) 1200 km long Pipeline Project. Construction of 173 km of access and maintenance earth roads.
- Position : Head Quality Control Engineer / Geologist and Deputy P. Manager
July 1998 to July 2000 : PAKISTAN (SOGREAH Engineering-France / HARZA/SOGREAH/N.D.C. Joint venture) CHASHMA Dam, Indus River Canal Right Bank Irrigation Project.165 km of main concrete canal + 600 km of distributory in concrete or/and compacted soil.
- Position : Head Quality Control Engineer / Geologist and Deputy P. Manager
January 1998 to May 1998 : ETHIOPIA (Coyne et Bellier Engineering- France / Coyne et Bellier /Howard Humphreys/Rust Kenney & Donkin joint Venture). Tis Abay II Hydro-electric
- Position : Geologist Engineer and quality control Supervisor
June 1996 to January 1998 : NIGERIA (Coyne et Bellier Ingenierie-FRANCE / World Bank Project -Nigeria Barrage Kainji rehabilitation civil work and electromechanical- Instrumentation and Rehabilitation
- Position : Site Manager
March 1996 to May 1996 : CHAD (Commission of the European Community Chad delegation /T.R Engineering- Luxembourg).Geotechnical Expert on road construction.
- Position : Geotechnician Expert
June 1994 to August 1994 :GABOON (LBTP Gabon)
- Position : Material and Quality Control
January 1990 to September 1993 :FRANCE (SNCF/TGV Railway- Lyon Lot12+ 23- Spie-Batignolles)
- Position : Head Quality Control Engineer + safety Manager
October 1988 to December 1990 : FRANCE (FRENCH NAVY-Cherbourg CAIMAN 3- Spie-Batignolles)Nuclear Sub-marine Dry Dock
- Position : Head Quality Control Engineer + safety Manager
November 1986 to August 1988 : KENYA (SOGREAH Engineering et KVDA KENYAN Government- KENYA Spie-Batignolles) .Turkwell Hydroelectric Complex- Electrical power plant and main concrete arch Dam.
- Position : H. Q. Control Engineer
November 1983 to August 1986 :INDONESIA (PT CRMIU-KRAKATAU STEEL - U.S. Steel - Indonesia-Spie-Batignolles). Cold rolling mill Steel Factory Complex
Relevant Links and Downloads
|
 |
Career Level:
Senior-level
Employment Status:
Employed on a long-term contract
Job Functions:
- Conduct research
- Manage Projects in the field
- Provide technical advice on projects
Available Start Date:
30 Mar 2010
Currently exploring employment opportunities
|